Skip to content
Gold 24K / tola399,687Dollar (market)276.91Dollar open market279.5Petrol / litre330
zaviya
Trending#1Khyber Pakhtunkhwa#2Pakistan#3Lahore#4Balochistan#5Karachi#6Islamabad#7Peshawar#8Gold rate#9Namaz timings#10Dollar rate#11Baby names#12Petrol price
Breaking

Karachi water supply restored after Dhabeji pumps back online

Karachi water supply is being restored gradually after KW&SC brought all 21 pumps at the Dhabeji Pumping Station back into operation following annual maintenance.

Zaviya Desk

· 2 min read

WhatsApp
Photo: Bilalhassan88 / CC BY-SA 3.0 / Wikimedia Commons

Karachi water supply has resumed after the Karachi Water and Sewerage Corporation (KW&SC), the city's water utility, finished annual maintenance at the Dhabeji Pumping Station and restored all 21 pumps to operation. The utility said supply to affected areas is being brought back to normal gradually. The work was carried out during a scheduled shutdown of the system.

What was done at Dhabeji

A KW&SC spokesperson said several technical and maintenance tasks were completed during the shutdown, including the installation of new valves. At Dhabeji, a new valve with a 60-inch diameter was installed, all pump houses received annual maintenance, and the operating system was serviced. A valve on Line No. 1 was repaired, and the internal water pipeline of the staff colony was also fixed.

Get Zaviya on WhatsApp →

Repairs at other sites

The spokesperson said important repair and development work was also carried out at several other locations to strengthen Karachi's water supply system. At the Pipri Pumping Station, all pump houses were maintained and the operating system received essential repairs. Along Shahrah-e-Bhutto, about 150 feet of a 32-inch-diameter pipeline was replaced and a new butterfly valve was fitted. A leakage in the Haleji Conduit, a large pipe or channel that carries water, was also repaired.

What happens next

After all 21 pumps at Dhabeji were running again, supply to Landhi, Korangi, Malir and Shah Faisal Town began to be brought back to normal, the spokesperson said. The utility described the process as gradual, so residents in those areas may see water return at different times rather than all at once. Households elsewhere in the city should follow KW&SC updates for any further changes. The spokesperson described the shutdown as an annual exercise aimed at improving the system.

Aasan alfaaz mein

Karachi mein pani ki supply dobara shuru ho gayi hai. KW&SC ne Dhabeji pumping station par saalana maintenance mukammal kar ke 21 pumps dobara chalu kar diye hain. Landhi, Korangi, Malir aur Shah Faisal Town mein pani aahista aahista normal ho raha hai. Agar aap in ilaqon mein rehte hain to pani ka flow dheere dheere behtar hoga, is liye kuch intezar karna pad sakta hai.

Questions readers ask

FAQ

Yes. KW&SC said it completed annual maintenance at the Dhabeji Pumping Station, restored all 21 pumps and resumed water supply to Karachi. Supply to affected areas is being gradually restored to normal.

#Karachi Water and Sewerage Corporation#Dhabeji pumping station#Karachi water supply#Landhi#Korangi#Malir#Shah Faisal Town
Share this story
WhatsApp
Web stories →

Add Zaviya as a preferred source on Google

Google par Zaviya ko apna pasandeeda source banayein.

Add on Google
Get Pakistan’s key news daily: follow usXFacebookInstagramLinkedInYouTubeWhatsApp

Morning briefing

Top Pakistan stories in your inbox.

Read next

More from Pakistan

See all

More from 16 November 2026

Share on WhatsApp